User Tools

Site Tools


2025_directives:25_25

Directive: 25-25 - Four (4) new Spartan Engines

2025 Directives

Date Issued: 11/07/2025

Operational Information

The four (4) Spartan Engines that have been on order should be delivered around mid-January, 2026. After the installation of the MDTs, radios, equipment brackets, and other miscellaneous work, the engines should ‘hit’ the line approximately in mid-February.

These engines will be deployed to: Stations 7, 16, 17, and 23

The currently scheduled domino effect is:

  • current engine 7 would go to 14's (106,401 miles)
  • current engine 16 would go to 19's (84,656 miles)
  • current engine 17 would go to 6's (71,324 miles)
  • current engine 23 would go to reserve status (203,864 miles)
  • current engine 6 would go to 13's (109,923 miles)
  • current engine 12 would go to 18's (86,494 miles)
  • current engine 19 would go to 12's (245,103 miles)

The Reserve Fleet would then include these engines;

  • 913 (2015 w/ 203,864 miles)
  • 980 (2009 w/ 232,943 miles)
  • 982 (2009 w/ 199,238 miles)
  • 983 (2009 w/ 236,547 miles)
  • 985 (2009 w/ 223,614 miles)
  • 974 (2008 w/ 226,038 miles)
  • 953 (2007 w/ 253,292 miles)
  • 954 (2007 w/ 254,535 miles)

In addition, some older higher mileage rigs will be removed from our inventory.


Effective Date: November 07, 2025

2025_directives/25_25.txt · Last modified: by Lt. Kirk

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki