The four (4) Spartan Engines that have been on order should be delivered around mid-January, 2026. After the installation of the MDTs, radios, equipment brackets, and other miscellaneous work, the engines should ‘hit’ the line approximately in mid-February.
These engines will be deployed to: Stations 7, 16, 17, and 23
The currently scheduled domino effect is:
current engine 7 would go to 14's (106,401 miles)
current engine 16 would go to 19's (84,656 miles)
current engine 17 would go to 6's (71,324 miles)
current engine 23 would go to reserve status (203,864 miles)
current engine 6 would go to 13's (109,923 miles)
current engine 12 would go to 18's (86,494 miles)
current engine 19 would go to 12's (245,103 miles)
The Reserve Fleet would then include these engines;
913 (2015 w/ 203,864 miles)
980 (2009 w/ 232,943 miles)
982 (2009 w/ 199,238 miles)
983 (2009 w/ 236,547 miles)
985 (2009 w/ 223,614 miles)
974 (2008 w/ 226,038 miles)
953 (2007 w/ 253,292 miles)
954 (2007 w/ 254,535 miles)
In addition, some older higher mileage rigs will be removed from our inventory.
Effective Date: November 07, 2025