==D Manual: Preface== =====Toledo Fire and Rescue Department===== ====D Manual - Maintenance==== ---- [[https://www.tfrdweb.com/dokuwiki/doku.php?id=d_manual&do=export_pdfns&book_ns=d_manual&book_title=D Manual|Export -Entire D Manual- to PDF]] **TO:** All Members\\ **FROM:** Chief Allison Armstrong, Director Toledo Fire and Rescue Department\\ **DATE:** 09/05/2025\\ **SUBJECT:** Maintenance Manual D – Sign off\\ Below is a brief summary of the main revisions to the Maintenance Manual - D. These updates have been reviewed by Myself, The Operations Bureau, TFCA-3382 and Local-92. Please note that there has been a significant change to the "Back-Flush" process, now titled "The Pump Flush Process" inside of D-5 - Pumps. These updates encompass countless hours of work and are due in large part from the efforts of Battalion Chief Michael Nicely and Lt. Craig Ellis. I am certifying the below procedures, to be effective immediately. \\ \\ \\ ---- ===Brief Summary of Changes - 2018 vs 2025=== **[[d1|Maintenance Bureau Responsibilities]] (link)** **Old:** PM program may be performed on maintenance day as needed.\\ **New:** PM program includes oil, filter, and fuel filter changes performed on maintenance day when mileage requires it.\\ **Old:** Maintenance Bureau handles PPE issuing, testing, repairing, replacement.\\ **New:** Adds bi-annual user gear inspections (Jan & July) with Gear Inspection Form on station dashboard.\\ \\ **[[d2|Apparatus and Motor Vehicles]] (link)** **Old:** No after-hours mechanic instructions provided.\\ **New:** Detailed coverage: Shop 0700–1500, 2nd shift 1500–2300, after-hours/weekend via Engage Toledo by Battalion Chiefs.\\ **Old:** DEF instructions – maintain 1/2 tank, notify shop when drums are empty.\\ **New:** Medic units must refill DEF only at shop during business hours; notify shop when drums are empty, vendor collects empty drums at exchange. \\ **[[d3|Vehicles / Driving]] (link)** **Old:** Fuel card replacement via 'City of Toledo Employee Fuel Card Form'.\\ **New:** Fuel card replacement via 'Fuel Card Form' on TFRDweb Bureau Forms; dead cards sent to shop officer.\\ **Old:** Apparatus movement reported to dispatcher.\\ **New:** Apparatus movement reported to RCOG dispatcher and Battalion Chief.\\ \\ **[[d4|Extreme Weather Operations]] (link)** **Old:** One firefighter can break, drain, roll 2 hoses before freezing.\\ **New:** Simplified: reload one attack line at a time; frozen hose placed in LDH bed for thawing.\\ **Old:** Normal motor operating temp fixed at 195°F.\\ **New:** Clarified: 180–195°F depending on thermostat; contact shop for cooler valve issues. \\ **[[d5|Pumps]] (link)** **Old:** Relief valve check weekly on tool day.\\ **New:** Relief valve check ideally daily during rig checks (minimum weekly).\\ **Old:** Monthly back-flush procedure using hydrant water.\\ **New:** Detailed pump flush process, replacing back-flush process, required every tool day, after drafting, or dirty hydrants. \\ **[[d6|Tools and Equipment]] (link)** **Old:** Wooden handles allowed varnish/linseed oil; paint discouraged due to cracks.\\ **New:** No full paint—slippery when wet; stricter guidance. \\ **[[d11|SCBA and Related Equipment]] (link)** Updated for MSA G-1. Slight revisions to the 0700 check processes. \\ **[[d12|Forms]] (link)** **New:** Expanded on location of forms on TFRDweb ---- {{ :d_manual:d_preface.png?nolink |}} <- ^ d_manual:start|Index ^ d_manual:d1 ->