User Tools

Site Tools


d_manual:start

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
d_manual:start [09/12/2024 16:12] – external edit (Unknown date) 127.0.0.1d_manual:start [07/07/2025 10:02] (current) – added 300-3 link Lt. Kirk
Line 1154: Line 1154:
 **300-1** __Hose Assignment Inventory__ **300-1** __Hose Assignment Inventory__
  
-This form is to be completed after the hose testing is complete in May. This form can be found on [[https://www.tfrdweb.com/bureau-forms/|TFRDWed under Station Dashboards and Bureau Forms.]]. This is to be completed by June 1st and anytime hose is added or removed from the station inventory.+This form is to be completed after the hose testing is complete in May. This form can be found on [[https://www.tfrdweb.com/bureau-forms/|TFRDWeb under Station Dashboards and Bureau Forms.]]. This is to be completed by June 1st and anytime hose is added or removed from the station inventory.
  
 __Hose Test Record__ __Hose Test Record__
Line 1165: Line 1165:
  
 \\  \\ 
-**300-3** __Apparatus Inspection Form__+**300-3** __Apparatus Inspection Form__ [[https://www.tfrdweb.com/dokuwiki/lib/exe/fetch.php?media=d_manual:300-3.pdf|PDF]]
  
 The 300-3 form will be filled out on the first (1st) Saturday of each month. The items listed on the form that are found to be unsatisfactory are to be marked with a check mark in the ‘Fire Shop’ column, and an explanation of the defect given in the remarks section. Those items that are checked O.K. should be listed in the ‘Job Done’ column by having the person making out the form put his /her initials on the proper line. There shall be a 300-3 form filled out for any apparatus / vehicle in service or stored in the fire station. A 300-3 will also be filled out for station generators on the first (1st) Saturday of each month. The completed 300-3 for should be kept at the station for review if necessary. Send the 300-3 form to the shop only if any defects The 300-3 form will be filled out on the first (1st) Saturday of each month. The items listed on the form that are found to be unsatisfactory are to be marked with a check mark in the ‘Fire Shop’ column, and an explanation of the defect given in the remarks section. Those items that are checked O.K. should be listed in the ‘Job Done’ column by having the person making out the form put his /her initials on the proper line. There shall be a 300-3 form filled out for any apparatus / vehicle in service or stored in the fire station. A 300-3 will also be filled out for station generators on the first (1st) Saturday of each month. The completed 300-3 for should be kept at the station for review if necessary. Send the 300-3 form to the shop only if any defects
d_manual/start.1726175553.txt.gz · Last modified: by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki